Cecilware FE100G Specifikace

Procházejte online nebo si stáhněte Specifikace pro Konvice na kávu Cecilware FE100G. Cecilware FE100G Specifications Uživatelská příručka

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 8
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 0
FE100G
Automatic Coffee Urn
OPERATION MANUAL
Contents
SPECIFICATIONS
INSTALLATION
ADJUSTMENTS
OPERATING INSTRUCTIONS
MAINTENANCE TIPS PARTS LIST
ILLUSTRATIONS WIRING
DIAGRAMS
FOR YOUR SAFETY
DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPORS AND
LIQUIDS IN THE VICINITY OF THIS OR ANY OTHER APPLIANCE.
THIS INSTALLATION MUST CONFORM WITH THE NATIONAL
FUEL GAS CODE ANSI Z223.1 (Latest Edition).
WARNING: IMPROPER INSTALLATION, ADJUSTMENT, ALTERATION OR
MAINTENANCE CAN CAUSE PROPERTY DAMAGE. INJURY OR DEATH.
READ THE INSTALLATION. OPERATION AND MAINTENANCE
INSTRUCTIONS THOROUGHLY BEFORE INSTALLING
OR SERVICING THIS EQUIPMENT.
WARRANTY
Every Ceclware product has been carefully inspected before shipment. The finest of materials and the highest
standards of workmanship have been but into the equipment.
Within 1 year of purchase, should any Cecilware product show defect in factory workmanship or material, we agree to
Repair, at our option or replace without cost to user such parts which prove upon factory inspection to have been so
defective. All equipment must be shipped transportation charges prepaid for acceptance. This warranty covers
replacement parts only, labor charges are covered for 90 days after installation.
This warranty does not apply under the following conditions:
neglect or abuse of equipment
excessive lime condition
Improper installation
any outside modification to equipment
Every Cecilware urn body is covered for three years. This warranty covers the stainless steel body
and stainless steel liners only.
Portable equipment such as Electric Fryers, Food Warmers, Electric Stoves, Dispensers, Plug-In
Urns, Coffee Brewers and Warmers must be returned to the factory or brought to an authorized
service station for repair.
CECILWARE CORPORATION
43-05 20th Avenue, Long Island City, N.Y. 11105 • 718-932-1414
N529A-4/92
Zobrazit stránku 0
1 2 3 4 5 6 7 8

Shrnutí obsahu

Strany 1 - FE100G

FE100G Automatic Coffee Urn OPERATION MANUAL Contents SPECIFICATIONS INSTALLATION ADJUSTMENTS OPERATING INSTRUCTIONS MAINTENANCE TIPS PARTS LIST ILLU

Strany 2 - IF YOU SMELL GAS:

FOR YOUR SAFETY DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPORS AND LIQUIDS IN THE VICINITY OF THIS OR ANY OTHER APPLIANCE. SAFETY PRECAUTIONS

Strany 3 - FE-100

FE-100 Gas SPECIFICATIONS Dimensions Body Depth 16" Overall Depth to faucet centers: 19 1/2" Working Height

Strany 4

RELIGHTING: Shut off all gas and wait 5 minutes before relighting pilot. SHUTTING DOWN: To shut down urn completely, turn gas cock knob to "OFF&q

Strany 5

Par. 3 THERMOSTAT: To adjust the temperature of the water in the urn (205°F) or (96°C), turn the thermostat knob to its maximum counter-clockwise posi

Strany 6

Par. 13. REPLACING WATER PUMP: 1. Turn off water and electrical power from urn. 2. Drain urn to level of center faucet. 3. Open the control box and di

Strany 7 - (FE 100 GAS Shown)

SPRAY ARM ASSEMBLY This new improved spray head system was designed to facilitate easier cleaning and mai

Strany 8

FE-100 G WIRING & SCHEMATIC DIAGRAMS

Komentáře k této Příručce

Žádné komentáře